El-Hamam agricultural wastewater treatment plant with a capacity of 7.5 million m³/day
Egypt/ 2022

Client: Ministry of Defence Engineering Authority Water Department

Contractor: Metito – Orascom- Arab contractors- Hassan Allam

Scope: 

  • Erection and welding carbon steel pipes and fitting  up to DN 2900mm
  • Fabrication  dismantling joints ,disk filter, ring flange segments up to DN 2600 mm
  • Fabrication , fuel tank up to 80 meter cube